Completed projects
TIEN SINH REFRIGERATION ELECTRICAL SERVICE AND ENGINEERING CORPORATION SL8 Phu Lam A Residential Area , Kinh Duong Vuong Street, Ward 12 , Distric 6 , HCMC Tel: (084) .8. 38. 756.756 * Fax: (084) .8. 38.777.972 Email: info@tse.vn * Web: www.tse.vn |
|||
SOME TYPICAL PROJECTS | |||
NO. | PROJECT NAME | LOCATION | WORK CONTENTS |
1 | CENTRAL VETERINARY MEDICINE FACTORY | 29 Nguyen Dinh Chieu St, Da Kao Ward, District 1, HCMC | Design, install vaccine manufacture room |
2 | SANOFI SYNTHELABO PHARMACEUTICAL FACTORY | 15/6C + 118 Dang Van Bi, Thu Duc District, HCM City | Execute the repair work AHU Store -Branch 1&2, QC LAB, Tablet department. |
3 | NAMYANG FACTORY | Song May Isdustrial Zone - Dong Nai province | Install electrical system at work shop |
4 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Supply and install electrical system for Mentos area and Coating 2 area. |
5 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Supply and install refrigeration system, 2 new Coating Pans system. |
6 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Move equipments, supply & install mechanical electrical system for moved equipments. |
7 | SOWHA SAIGON FACTORY | VSIP 1 Industrial Zone - Binh Duong | Install condensing unit |
8 | TAIHAN SACOM FACTORY | Long Thanh Industrial Zone - Dong Nai | Install electrical system at work shop. |
9 | PACKSIMEX OFFICE BUILDING | 52 Dong Du Street, Distric 1, HCMC | Supply and install air conditioning system. |
10 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Supply and install M&E system for equipments. |
11 | GLOMED - 2 PHARMACEUTICAL FACTORY | VSIP 1 Industrial Zone - Binh Duong | Design HVAC system to meet GMP-WHO standard |
12 | SV PROBE VN FACTORY | VSIP 1 Industrial Zone - Binh Duong | Supply and install M&E system for clean room. |
13 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Supply and install electrical system for Chupa Chups line. |
14 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Install 06 Coating Pans (4 GMP 450 and 2 GMP 350). |
15 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Move 04 AHU to serve the expanded project Chupa Chups line and flavouring room. |
16 | SOURTHERN REGION AIR TRAFFIC SERVICES | 22 Tran Quoc Hoan, Tan Binh District , HCMC | Supply spare materials for electrical system |
17 | SV PROBE VN FACTORY | VSIP 1 Industrial Zone - Binh Duong | Supply cable and truking |
18 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Install and move AHU for Chupa Chups & Lollipop system. |
19 | TAN AN POST OFFICE | Long An | Replace air conditioner. |
20 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Supply and install power & control electrical system for Lollipop Deposted line |
21 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Install condensing unit |
22 | CENTRAL PHARMACEUTICAL JOINT STOCK COMPANY 25 | No. 448B, Nguyen Tat Thanh Street, District 4, HCMC | Supply and install air duct system |
23 | VIET NAM AIR FILTER MANUFACTURE FACTORY | Dong An 2 - Industrial Zone - Binh Duong | Supply, install ventialation system at work shop |
24 | SOWHA SAIGON FACTORY | VSIP 1 Industrial Zone - Binh Duong | Supply and install metal surface wash system |
25 | HA TIEN 1 CEMENT COMPANY | Phu Huu ward, Distric 9 HCMC | Supply, install condensing water cooled system |
26 | NESTLE VIET NAM FACTORY | Bien Hoa 2 Industrial Zone - Dong Nai | Install electrical system for wastewater treatment plant. |
27 | NESTLE VIET NAM FACTORY | Bien Hoa 2 Industrial Zone - Dong Nai | Install mechanical & electrical system for office extension. |
28 | NESTLE VIET NAM FACTORY | Bien Hoa 2 Industrial Zone - Dong Nai | Install mechanical & electrical system for canteen extension. |
29 | NEW VIET DAIRY | Song Than 1 Industrial Zone - Binh Duong | Construct clean room meet HACCP Standard. |
30 | NESTLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Supply and install trunking & control panel system for Milo Filling Room. |
31 | CENTRAL PHARMACEUTICAL JOINT STOCK COMPANY 25 | No. 448B, Nguyen Tat Thanh Street, District 4, HCMC | Design, supply and install clean room system |
32 | CENTRAL PHARMACEUTICAL JOINT STOCK COMPANY 25 | No. 448B, Nguyen Tat Thanh Street, District 4, HCMC | Design, supply and install pharmaceutical manufacture room meet GMP-WHO standard. |
33 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Move and install electrical & mechenical equipmets at cooking area and cartoning area. |
34 | THANG LONG CEMENT FACTORY | Hiep Phuoc Industrial Zone, Nha Be District, HCMC | Design, supply, and install ventilation and air conditioning system, |
35 | THANG LONG CEMENT FACTORY | Hiep Phuoc Industrial Zone, Nha Be District, HCMC | Supply materials and fixing for cable tray system instaltion. |
36 | RUBBER BUILDING | No. 177, Hai Ba Trung Str., District 3, HCMC | Supply and install building management system (BMS), and control automatic lighting. |
37 | SHOWROOM-NORFOLK HOTEL | To execute air conditioning system | |
38 | PROVIMI VIETNAM FACTORRY | No.238, National Highway 1A, Tan Hiep Ward, Bien Hoa City, Dong Nai Province | Design, supply and install veterinary medicine workshop, meet GMP-WHO standard |
39 | TAN SON NHAT TERMINAL OPERATION CENTER | Ward 2, Tan Binh District, HCM City | Maintain fire sprinkler system, and Smoke fan system |
40 | TAY NGUYEN OBSTETRIC HOSPITAL (250 BEDS, 06 OPERATION ROOMS) |
Ngo Gia Tu Street, Tan An Ward, Buon Ma Thuot City, DakLak Province, Vietnam | The contract for design, supply and install air cooling and ventilation system at operation room and office area. |
41 | DONG NAI NESTLE FACTORY | Bien Hoa 2 Industrial Zone - Binh Duong | Supply and install exhaust system for "Maggi" |
42 | THANG LONG CEMENT FACTORY | Hiep Phuoc Industrial Zone, Nha Be District, HCMC | Supply and install compress air piping system |
43 | THANG LONG CEMENT FACTORY | Hiep Phuoc Industrial Zone, Nha Be District, HCMC | Supply materials and fixing for cable tray system instaltion - work arising . |
44 | RUBBER BUILDING | No. 177, Hai Ba Trung Str., District 3, HCMC | Supply and install fire alarm system |
45 | TRI AN NESTLE FACTORY | AMATA Industrial Zone - Binh Duong | Supply and install air conditioning system for MCC room, and control room. |
46 | TRI AN NESTLE FACTORY | AMATA Industrial Zone - Binh Duong | Supply and install exhaust fan for Extraction building |
47 | NIDEC TOSOK | Tan Thuan industrial zone, District 7, HCMC | Supply and install M&E system. |
48 | SFC Building | 146E Nguyen Dinh Chinh street, Ward 8, Quaän Phuù Nhuaän TP. HCM | Supply and install air condtioning and ventilation system. |
49 | Nestle Binh An Factory | No. 2 Street, Amata Industrila Zone, Bien Hoa, Dong Nai | Supply and install electrical & mechanical system. |
50 | P&G Binh Duong Factory | Dong An Industrial Zone, Binh Duong | Design, supply and intstall electrical & mechanical system for Micro Lab. |
51 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Move and install air conditionning and ventilation system. |
52 | SEED PRODUCT FACTORY | VSIP IIA - Binh Duong | Supply and install air conditionning and ventilation system. |
53 | CENTRAL PHARMACEUTICAL JOINT STOCK COMPANY 25 | No. 448B, Nguyen Tat Thanh Street, District 4, HCMC | Design, supply and install clean room system. |
54 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Air conditioning and ventilation for Chupa line. |
55 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Air conditioning and ventilation for Chocolate line |
56 | Nestle Dong nai Factory | Bien Hoa 2 Idustrila zone, Bien Hoa, Dong Nai | Air conditioning and ventilation for maggi line 3 |
57 | Nestle Tri An Factory | Amata industrial zone, Bien Hoa, Dong Nai | Warehouse ventilation |
58 | CENTRAL PHARMACEUTICAL JOINT STOCK COMPANY 25 | No. 448B, Nguyen Tat Thanh Street, District 4, HCMC | M&E Work for materrial warehouse |
59 | PERFETTI VAN MELLE VIET NAM FACTORY | Song Than 2 Industrial Zone - Binh Duong | Air conditioning for GUM room |
60 | BUILT 2220 APARTMENTS | Binh Khanh ward, District 2, HCMC | Electrical - low voltage system - Supply and waste water |
61 | BUILT 2220 APARTMENTS | Binh Khanh ward, District 2, HCMC | Air conditioning and ventilation |
62 | GLOMED WAREHOUSE | VSIP, Thuan An, Binh Duong | Electrical system and Air Conditioning |
63 | Trimmer factory | Lot K4, N4 Street, Nam Tan Uyen expansion industrial zone, Tan Uyen, Binh Duong | Electrical system and Air Conditioning |
64 | Nestle Binh An Factory | Amata industrial zone, Bien Hoa, Dong Nai | Cooling system for packing area |
65 | GLOMED OFFICE | VSIP, Thuan An, Binh Duong | Electrical system and Air Conditioning |
66 | PERFETTI VAN MELLE VIET NAM FACTORY | Lot K4, N4 Street, Nam Tan Uyen expansion industrial zone, Tan Uyen, Binh Duong | Install new chiller system |
67 | BUILT 1330 APARTMENTS | Binh Khanh ward, District 2, HCMC | Supply and waste water-Air conditioning and ventilation |
68 | Nestle Dong nai Factory | Bien Hoa 2 Idustrila zone, Bien Hoa, Dong Nai | Air conditioning and ventilation for AQ extention |
69 | PERFETTI VAN MELLE VIET NAM FACTORY | Lot K4, N4 Street, Nam Tan Uyen expansion industrial zone, Tan Uyen, Binh Duong | Install new hot water system for Drying room and cool room |
70 | NETAFIM | Long Thanh, Dong Nai | Supply and install cooling system” for Green houses of VinEcoat Long Thanh Farm |
71 | Nestle Dong nai Factory | Bien Hoa 2 Idustrila zone, Bien Hoa, Dong Nai | Air conditioning and ventilation for QA office |
72 | Nestle Binh An Factory | Amata industrial zone, Bien Hoa, Dong Nai | Air conditioning and ventilation for LC room |
73 | Nestle Binh An Factory | Amata industrial zone, Bien Hoa, Dong Nai | Air conditioning and ventilation for Cool room |
74 | Nestle Binh An Factory | Amata industrial zone, Bien Hoa, Dong Nai | Air conditioning and ventilation for LV room |
75 | KAOS Factory | Amata industrial zone, Bien Hoa, Dong Nai | Air conditioning and ventilation for Cool room (Phase 1) |
76 | CHARMINGTON LA POINTE building | Cao Thang, District 10, HCMC | Air conditioning and ventilation building |
77 | HEINEKEN FACTORY | My Xuan industrial zone, Ba Ria | Supply and install Air duct and control for Dehumifier machine Tank in Box |
78 | NETAFIM CAN THO | Ccan Tho City | Supply and install cooling system” for Green houses |
79 | KAOS Factory- Phase 2 | Amata industrial zone, Bien Hoa, Dong Nai | Air conditioning and ventilation for Cool room (Phase 2) |
80 | Nestle Dong nai Factory | Bien Hoa 2 Idustrila zone, Bien Hoa, Dong Nai | Air conditioning and ventilation for SERVER-UPS room |
81 | NestleTri An Factory | Amata industrial zone, Bien Hoa, Dong Nai | Modify Electrical system, supply and install Air conditioner for New Showroom |
82 | PERFETTI VAN MELLE VIET NAM FACTORY | Lot K4, N4 Street, Nam Tan Uyen expansion industrial zone, Tan Uyen, Binh Duong | Install AHU, MUNTER for Jellies packing (phase 1) |
83 | ALMA RESORT | Cam Lam Distric, Khanh Hoa Province, Viet Nam | Install Air conditioner and install Electric system for MVAC |
84 | PERFETTI VAN MELLE VIET NAM FACTORY | Lot K4, N4 Street, Nam Tan Uyen expansion industrial zone, Tan Uyen, Binh Duong | Install new chiller system NO.7 |
85 | PERFETTI VAN MELLE VIET NAM FACTORY | Lot K4, N4 Street, Nam Tan Uyen expansion industrial zone, Tan Uyen, Binh Duong | MOVING AND INSTALLING MUNTER MACHINES |
86 | NETAFIM | Can Tho | Install new chiller |
87 | NestleTri An Factory | Amata industrial zone, Bien Hoa, Dong Nai | Cooling electrical cabinets |
88 | Nestle Dong nai Factory | Bien Hoa 2 Idustrila zone, Bien Hoa, Dong Nai | installing battery charging room wind system |
89 | HEINEKEN FACTORY | My Xuan industrial zone, Ba Ria | Supply and install Air duct and control for Dehumifier machine Tank in Box 11 and connect with Tank in Box 5.1 |
90 | PHU QUOC INTERNATIONAL AIR PORT | Phu Quoc, Kien Giang | Mainternance Fire Protection System for Phu Quoc International Air Port |
91 | Nestle Dong nai Factory | Bien Hoa 2 Idustrila zone, Bien Hoa, Dong Nai | Equipment and services for spiral cooler system |
92 | TAN SON NHAT AIR PORT | Ward 2, Tan Binh District, HCM City | Mainternance Fire Protection System for Tan Son Nhat Air Port |
93 | Huhtamaki Factory | VSIP, Binh Duong | Supply and install chilled water coil for Winsor machine |
94 | Nestle Dong nai Factory | Bien Hoa 2 Idustrila zone, Bien Hoa, Dong Nai | Fresh air ventialtion sapan |
95 | USHI TSUKI BUFFET RESTAURANT | Bien Hoa, Dong Nai | Supply and Install Air conditioning and ventilation |
96 | Huhtamaki Factory | VSIP, Binh Duong | Move and install existing chiller |
97 | Fremed Factory | Hiep Phuoc Industrial Zone, Nha Be District, HCMC | Supply and install power for Laundry Area Fresh air system for Dry machine |
98 | Huhtamaki Factory | VSIP, Binh Duong | Move and install existing PAU from NM2 to NM1 |
99 | Huhtamaki Factory | VSIP, Binh Duong | Exhaust air system for solvents and install new coil |